New Western Lake Bridge In the Works

Posted by Jamie Conley on Monday, October 5th, 2020 at 3:12pm.

30A at Western Lake Bridge

The Florida Department of Transportation (FDOT)  is currently working on the design and plans for the replacement of the existing bridge on Hwy 30A located immediately west of Watercolor  that goes over Western Lake. The project is scheduled to begin in the Fall 2023 and is estimated to take approximately 16 months for completion.

Western Lake Bridge Locator

According to the announcement from FDOT both lanes of Hwy 30A and the shared pedestrian/bicycle path will remain open throughout the duration of construction.  Planned improvements include new guardrail, new approaches to the bridge and minor drainage improvements. 

The new two lane bridge is slated to provide twelve-foot wide vehicular travel lanes in both east and west travel directions along with an eight-foot wide shoulder on each side.  Weather permitting, it is anticipated that the new bridge will be completed by Summer 2024. 

For questions about the project contact:

Alicia Brininger District Three Title VI Coordinator 888.638.0250 or alicia.brininger@dot.state.fl.us

 
 
 
 
[The Florida Department of Transportation does not discriminate on the basis of race, color, national origin, age, sex, religion, disability or family status.]

Leave a Comment

Format example: you@domain.com
Format example: yourwebsitename.com